Transition Bath have been working with Bath Preservation Trust to reduce their heating bills at the Building of Bath Collection.
In February Bill, Jan and Jon carried out a thermal imaging survey and wrote up a report which is available here. Jill Hunter the museum administrator was already aware of most of the issues. As a result some ‘easy wins’ were identified and in May we returned to start draught-proofing a number of doors using cheap low cost draught-proofing material.
We aim to return in the Autumn to continue the work by looking at the heating system, the Collections 4 gas boilers and thermostatic controls.